Bessbrook Pond Refurbishment, Newry
Contract Value:
225000
Consulting Engineer:
Ferguson McIlveen
Engineer's Representative:
Pat Turley (028 9070 5111)
Client:
Newry & Mourne District Council
Client's Representative:
Eamon McManus (028 3031 3233)
Works Completion Date:
July 2003
Scope of the Works:
Sheet piling to approx. 150m length of embankment with pile length varying from 5m to 7m. Piles will be back-driven to rock where possible in order to stem seepage of water through the existing embankment. Construction of a new Draw-off chamber and outlet pipework from pond. Provision of new toe drains to embankment.
Areas of Expertise
Select Category Below
== Please Select ==
Marine Civil Engineering
Coastal Defences
General Civil Engineering
Piling
Groundworks & Pipework
Retaining Walls & Reinforced Earth Slopes
Slipways
Dredging
Jetty & Pontoon Installation
Groundworks & Pipelaying
Kilronan Harbour Development – Inishmor (Aran Islands off Galway, Ireland)
Tall Ships Pontoon Installation, Belfast
Caladh Mor Harbour, Inishmaan (Aran Islands off Galway, Ireland)
Victoria Terminal 4, Belfast (New Stena Berth)
Carrickfergus Harbour & Marina Upgrades
Kilkeel Harbour Quay Wall Repairs
Killough Rope Walk, Co. Down
Replacement Jetty at Portneal, Kilrea
Portavogie Slipway Refurbishment and Effluent Collection System
Refurbishment of South Pier, Kilkeel Harbour
NIR Sea Defences – Salt Mines
NIR Sea Defences – Whitehead
Upgrades to Ballyronan Marina, Lough Neagh
Upgrades to The Battery Harbour, Lough Neagh
Quoile Barrier Remedial Works, Strangford Lough
New RNLI Berth at Rosslare, Co. Wexford
Strandhill Coastal Defences and Slipway, Sligo
Quay Wall at Killyleagh Harbour Development
Bessbrook Pond Refurbishment, Newry
Millenium Way Cyclepath at Whiteabbey, Co. Antrim