New RNLI Berth at Rosslare, Co. Wexford
More Images:
1
2
3
4
5
6
7
Contract Value:
£225,000
Consulting Engineer:
Royal Haskoning
Engineer's Representative:
Rodney Woodhouse (01444 458551)
Client:
RNLI
Client's Representative:
Seastructures Ltd
Works Completion Date:
July 2004
Scope of the Works:
Works Comprised: - Construction of new Rock Armoured Breakwater - Dredging of the new berth including the breaking out and removal of the concrete foundations of the previous Berthing Pen - comprising 20No 2mx2mx2m foundations in up to 6m depth of water. - Installation of 18No Dia. 457mm piles drilled 3m into rock to form the substructure for the new Landing Stage and Walkway. - Regrading of the existing Rock Armoured Revetment within the new basin.
Areas of Expertise
Select Category Below
== Please Select ==
Marine Civil Engineering
Coastal Defences
General Civil Engineering
Piling
Groundworks & Pipework
Retaining Walls & Reinforced Earth Slopes
Slipways
Dredging
Jetty & Pontoon Installation
Groundworks & Pipelaying
Kilronan Harbour Development – Inishmor (Aran Islands off Galway, Ireland)
Tall Ships Pontoon Installation, Belfast
Caladh Mor Harbour, Inishmaan (Aran Islands off Galway, Ireland)
Victoria Terminal 4, Belfast (New Stena Berth)
Carrickfergus Harbour & Marina Upgrades
Kilkeel Harbour Quay Wall Repairs
Killough Rope Walk, Co. Down
Replacement Jetty at Portneal, Kilrea
Portavogie Slipway Refurbishment and Effluent Collection System
Refurbishment of South Pier, Kilkeel Harbour
NIR Sea Defences – Salt Mines
NIR Sea Defences – Whitehead
Upgrades to Ballyronan Marina, Lough Neagh
Upgrades to The Battery Harbour, Lough Neagh
Quoile Barrier Remedial Works, Strangford Lough
New RNLI Berth at Rosslare, Co. Wexford
Strandhill Coastal Defences and Slipway, Sligo
Quay Wall at Killyleagh Harbour Development
Bessbrook Pond Refurbishment, Newry
Millenium Way Cyclepath at Whiteabbey, Co. Antrim