Phase 2 Dredging at Torry Quay, Aberdeen Harbour

Phase 2 Dredging at Torry Quay, Aberdeen Harbour

Contract Value: £750,000
Consulting Engineer: Aberdeen Harbour Board
Engineer's Representative: Mr Eddie Aitken
Client: Aberdeen Harbour Board
Client's Representative: Mr Eddie Aitken (01224 597000)
Works Completion Date: April 2012

Scope of the Works:

  • Dredging and sea disposal of approx. 48,000m3 along the approach channel at Torry Quay.

 

  • Dredging was carried out using a spudleg Barge with 95T Long Reach Excavator loading a 450m3 dumb-Split-Hopper barge towed and manoeuvred within the Harbour by a 34T Bollard Pull Tug, and taken to sea for offshore disposal of dredge material.