Portglenone Marina Phase 2 - Pontoon Piling

Portglenone Marina Phase 2 - Pontoon Piling

Contract Value: £85,000
Consulting Engineer: McCutcheon & Wilkinson
Engineer's Representative: Mr Norman Graham (028 2564 6429)
Client: McLaughlin & Harvey
Client's Representative: John Glass (028 9034 2777)
Works Completion Date: July 2011

Scope of the Works:

  • Removal of existing pontoons, mooring chains & anchor blocks.
  • Installation of temporary sheet piled cofferdam for construction of canoe access steps.
  • Installation of 12No pontoon locating piles – installed from a spudleg barge with the piles being installed using an Odex drilling system to socket the piles 3.0m into rock.