Quay Wall at Killyleagh Harbour Development
Contract Value:
£120,000
Consulting Engineer:
Kirk McClure Morton (02890 667914)
Engineer's Representative:
Adam Holland (02890 342777)
Client:
McLaughlin & Harvey Ltd
Client's Representative:
Peter Duffy
Works Completion Date:
2001
Scope of the Works:
Construction of new reinforced concrete retaining wall and walkway on PC piled foundations along shoreline associated with development of new townhouses and apartments adjacent the harbour. Retaining wall faced with masonry cladding. Cast Iron handrailing and bollards; Lifebelts and miscellaneous quayside furniture.
Areas of Expertise
Select Category Below
== Please Select ==
Marine Civil Engineering
Coastal Defences
General Civil Engineering
Piling
Groundworks & Pipework
Retaining Walls & Reinforced Earth Slopes
Slipways
Dredging
Jetty & Pontoon Installation
Groundworks & Pipelaying
Kilronan Harbour Development – Inishmor (Aran Islands off Galway, Ireland)
Tall Ships Pontoon Installation, Belfast
Caladh Mor Harbour, Inishmaan (Aran Islands off Galway, Ireland)
Victoria Terminal 4, Belfast (New Stena Berth)
Carrickfergus Harbour & Marina Upgrades
Kilkeel Harbour Quay Wall Repairs
Killough Rope Walk, Co. Down
Replacement Jetty at Portneal, Kilrea
Portavogie Slipway Refurbishment and Effluent Collection System
Refurbishment of South Pier, Kilkeel Harbour
NIR Sea Defences – Salt Mines
NIR Sea Defences – Whitehead
Upgrades to Ballyronan Marina, Lough Neagh
Upgrades to The Battery Harbour, Lough Neagh
Quoile Barrier Remedial Works, Strangford Lough
New RNLI Berth at Rosslare, Co. Wexford
Strandhill Coastal Defences and Slipway, Sligo
Quay Wall at Killyleagh Harbour Development
Bessbrook Pond Refurbishment, Newry
Millenium Way Cyclepath at Whiteabbey, Co. Antrim