Refurbishment of South Pier, Kilkeel Harbour

Refurbishment of South Pier, Kilkeel Harbour

Contract Value: £325,000
Consulting Engineer: Dr G Doran
Engineer's Representative: Mr Keith Weatherup (07799 663072)
Client: McLaughlin & Harvey Ltd
Client's Representative: John Glass (028 9034 2777)
Works Completion Date: March 2005

Scope of the Works:

Works Comprised:

  1. Demolition of existing heavily-reinforced concrete deck slab
  2. Excavation for and construction of Reinforced Concrete Anchor Beam
  3. Installation of Tie Bars and Walings on new sheet pile wall (installed by McLaughlin & Harvey).
  4. Backfilling of new Quay wall with pulverised concrete demolished from the existing Pier.
  5. Installation of services and preparation for construction of new RC deck slab.
  6. Construction of new Core Loc Armoured breakwater on seaward face of South Pier.