Refurbishment of South Pier, Kilkeel Harbour
| Contract Value: |
£325,000 |
| Consulting Engineer: |
Dr G Doran |
| Engineer's Representative: |
Mr Keith Weatherup (07799 663072) |
| Client: |
McLaughlin & Harvey Ltd |
| Client's Representative: |
John Glass (028 9034 2777) |
| Works Completion Date: |
March 2005 |
Scope of the Works:
Works Comprised: - Demolition of existing heavily-reinforced concrete deck slab
- Excavation for and construction of Reinforced Concrete Anchor Beam
- Installation of Tie Bars and Walings on new sheet pile wall (installed by McLaughlin & Harvey).
- Backfilling of new Quay wall with pulverised concrete demolished from the existing Pier.
- Installation of services and preparation for construction of new RC deck slab.
- Construction of new Core Loc Armoured breakwater on seaward face of South Pier.
|
 |