Upgrades to The Battery Harbour, Lough Neagh
Contract Value:
£75,000
Consulting Engineer:
White Young Green
Engineer's Representative:
Paul McErlean (028 9070 6000)
Client:
Geda Construction
Client's Representative:
John Coalter (028 8774 7600 / 07764 153953)
Works Completion Date:
March 2007
Scope of the Works:
Rock armouring to 40m long breakwater and reconstruction of 3No rock armoured Eel pools. Construction of 45m long retaining wall comprising:- 6m long PU18 Sheet Piles driven initially using an Excavator Mounted (EMV400) Piling Hammer and back-driven using a crane suspended HH2 hydraulic Impact hammer. Reinforced concrete pilecap and associated 2m wide path behind same. Regrading of embankments.
Areas of Expertise
Select Category Below
== Please Select ==
Marine Civil Engineering
Coastal Defences
General Civil Engineering
Piling
Groundworks & Pipework
Retaining Walls & Reinforced Earth Slopes
Slipways
Dredging
Jetty & Pontoon Installation
Groundworks & Pipelaying
Kilronan Harbour Development – Inishmor (Aran Islands off Galway, Ireland)
Tall Ships Pontoon Installation, Belfast
Caladh Mor Harbour, Inishmaan (Aran Islands off Galway, Ireland)
Victoria Terminal 4, Belfast (New Stena Berth)
Carrickfergus Harbour & Marina Upgrades
Kilkeel Harbour Quay Wall Repairs
Killough Rope Walk, Co. Down
Replacement Jetty at Portneal, Kilrea
Portavogie Slipway Refurbishment and Effluent Collection System
Refurbishment of South Pier, Kilkeel Harbour
NIR Sea Defences – Salt Mines
NIR Sea Defences – Whitehead
Upgrades to Ballyronan Marina, Lough Neagh
Upgrades to The Battery Harbour, Lough Neagh
Quoile Barrier Remedial Works, Strangford Lough
New RNLI Berth at Rosslare, Co. Wexford
Strandhill Coastal Defences and Slipway, Sligo
Quay Wall at Killyleagh Harbour Development
Bessbrook Pond Refurbishment, Newry
Millenium Way Cyclepath at Whiteabbey, Co. Antrim