Upgrades to The Battery Harbour, Lough Neagh

Upgrades to The Battery Harbour, Lough Neagh

Contract Value: £75,000
Consulting Engineer: White Young Green
Engineer's Representative: Paul McErlean (028 9070 6000)
Client: Geda Construction
Client's Representative: John Coalter (028 8774 7600 / 07764 153953)
Works Completion Date: March 2007

Scope of the Works:

  • Rock armouring to 40m long breakwater and reconstruction of 3No rock armoured Eel pools.
  • Construction of 45m long retaining wall comprising:-
    • 6m long PU18 Sheet Piles driven initially using an Excavator Mounted (EMV400) Piling Hammer and back-driven using a crane suspended HH2 hydraulic Impact hammer.
    • Reinforced concrete pilecap and associated 2m wide path behind same.
  • Regrading of embankments.



Areas of Expertise