Piles were all installed from floating plant with piles being driven by crane suspended vibrating piling hammer.
Installation of 26No 10T precast concrete Anchor Blocks on the seabed along with Dia. 25mm and Dia. 32mm chains @ 30m long for connection to Walcon Mooring pontoons